NR 58 / 54 speed towards Booraan leading 6MP4. 6/1/08 |
NR 20 / 24 / 60 pass the loop extension work at Bodallin with 7MP7 freight. 6/1/08 |
NR 11 / 92 / XRB 560 speed away from Doodlakine with 1PM5 freight. 6/1/08 |
DAZ 1905 climbs the grades out of Wogarl with 2455 grain. 7/1/08 |
DAZ 1905 overtakes DAZ 1903 as it loads 2453 grain at Muntadgin. |
As the two Prospector sets cross at Merredin station, DAZ 1903 rolls past with grain loading. |
LZ 3107 crosses the diamond crossing at the east end of West Merredin yard with salt loading from Koolyanobbing. 7/1/08 |
G 533 / 513 / 515 roar through Moorine Rock with 7GP1 SCT freight. 6/1/08 |
NR 7 / AN 9 approach Koolyanobbing from Darrine with 1AP2. 8/1/08 |
DC 2205 / L 3113 catch the first sunlight of the day as they depart the loop at Booraan with 6053 grain for Bodallin. 12/1/08 |
K 210 leads 7B11 rail train past the site of the narrow gauge flyover at Bungulla.12/1/08 |
K 210 crosses the Prospector at Kellerberrin. |