Spearwood Junction staff cabin. 16/1/87 |
Y 1109 arrives at Spearwood Junction. After collecting the staff, the train will head out to the Elders woolstores at Bibra Lake. 16/1/87 |
Y 1109 proceeds onto the Bibra Lake branch. 16/1/87 |
Australian National unit BL 30 lays over at Forrestfield. 28/9/87 |
Work proceeds at the Roe-st tunnel for the new Northern Suburbs railway. 5/10/91 |
D 1562 / DB 1585 / DA 1571 pass the old Midland platform on a light engine trial. 9/1/01 |
Grain is unloaded from an RCH wagon at the CBH depot at West Merredin. |
The water tank and goods shed are still prominent landmarks at Corrigin. |